Tuesday, January 21, 2014

THE ZONE


Map displayed on back of airplane seat. SF-Newark-Lisboa-Barcelona. 2013.
Everyone has their zone, their area of happiness. When you are in this zone you are at peace with yourself, and the unpleasant or difficult things in your life have temporarily been put on hold. There is no prescriptive list of zones, and no limited number of zones each person can have. It’s almost as though you have no control over this area - your zone chooses you, and this place of peace can keep you going in times of trouble. I heard the artist Jim Dine state in a lecture that drawing saved his life. It can be that extreme.
Santa Maria Novella, Firenze, Italia. Alberti, 1456-1570. Drawn summer 1985. Alone and unlimited time to sketch.

It is possible to sometimes forget about one our magical zones, and it is not until we find ourselves in that forgotten zone that we are shocked into that ‘ah-hah moment’ - yes, I feel as good as I can possible feel at this moment. It is always a pleasure to be in one of our zones, and equally pleasurable to discover a new zone. It is part of what shapes us and defines us.

I have several zones of peace and comfort - swimming, cycling, cooking, drawing. Traveling is also one of my zones. I love to travel. I will travel anywhere and have traveled far. Beginning many years ago with a red backpack and a Eurail pass, I saw a certain part of the world. I had unlimited time but little money. Moving from backpack to duffle bag, rail pass to 125cc motorcycle, but still more time than money, I saw another part of the world. As time became more limited and money a bit more plentiful, traveling changed from camping and hostels to hotels and sailboats (and camping), from eating bread and cheese to hot meals in restaurants (and cooking over an open fire). The type of travel changed over time, but the joy of travel remained. 
Map showing international date line. Drawn sitting on a beach in Baja, California, summer 2012. Pondering where to travel next. Pilot razor point felt pen, pencil, water color.
So why do we travel? To learn, to see, and to understand. To get lost, to escape, and to experience. There are a million reasons to travel, and reasons change, as does the type of travel we do.

A significant change occurred when I became an architect, when I learned to draw. When I travel, I draw. I draw maps, buildings, streetscapes, anything I see that I find interesting or evocative. My sketchbook is my companion, my documentation, my method of understanding. I am a true believer in the idea that drawing teaches us to see. “In the process of recreating with our own hand what lies before our eyes, we seem naturally to evolve from observing beauty in a loose way to possessing a deep understanding of its constituent parts and hence more secure memories of it.”  (“The Art of Travel” by Alain de Botton).

Paris rooftops from hotel room while on the Branner Fellowship, 1986-87. Rotring pen, wash.
London pub near the British Museum. Waiting for a friend. Rotring pen.
While sketching in a café on my last trip, a Dutch man struck up a conversation with me, and asked how many sketchbooks I had. I had never considered this question, and responded that I probably had a few dozen sketchbooks. When I returned home to California I counted 78 sketchbooks in my library. When I open any of these books I remember the details around each drawing - the precise location, the time of day, the weather. If I was alone and taking my time drawing, or drawing quickly, as I did not want to keep a companion waiting in the rain, the cold, the heat, while I sketched. Kindly, my husband frequently points out a café and tells me he’ll be waiting there until I’m done. My children are fantastically patient while I draw. Loosing myself in thought (or non-thought) while drawing causes time to freeze, frequently resulting in companions wandering off, and the subsequent search for each other in an impossibly crowded museum or in an expansive garden. 

Cordoba, Spain, 2013. Quick sketch of courtyard and interior of the Mezquita.

Chateau Le Windsor, Plorec, Bretagne, France. Nick-named 'Chateau No-where'. Worth the drive to find this remote hotel. A very cold pool.
Everyone can draw. Some people draw naturally, but most people need to learn to draw. And the only way to learn to draw is to draw - to be patient, and just draw. Drawing reinforces place, shape, relationships  - how a tree branch attaches to a trunk, how the tree trunk connects to the earth. The same may be said of a building – how does a building connect to the earth, its roof to the sky? When you draw you see differently, and memories of places and objects become indelibly etched in your mind.
Unite d'Habitation, Berlin. Block building by Le Corbusier. 1956-1959.  Drawn on a very cold winter day. 1987. The first Corbu Unite building I'd seen.

Sant Pere de Rodes Monesterio, near Cadeques, Espana. Benedictine Monastery founded 945. In use until 1793. Drawn with 4-color Bic pen, November, 2013. Cold, windy, and raining.

Drawing is a universal language, one that has not changed since Galileo’s drawings examining the relationship of art and science, all the way back to the Lascaux cave drawings. It is a universal language of communication with others, but it is also a communication with ourselves. Drawing is a skill I think all good architects should have, and many do. Years ago when I decided to become an architect I was told by more than a few people that I couldn’t be an architect because I couldn’t draw. And so I learned how to draw.
Dubrovnik, former Yugoslavia. 1986. Drawn with a soft pencil. Continually approached by ganja sellers while sketching.

Split, former Yugoslavia. 1986. Waiting for midnight ferry to Italy. Alone with lots of time.

Globe rescued from junk day pick-up in Portola Valley, 1998. Drawn in Tahoe, 2014. Pilot razor point pen, purple pencil.

 
Sketching in Cadaques, Espana. 2013. Cold, windy, but not raining.

Monday, October 21, 2013

WHAT DO ARCHITECTS REALLY DO?



There is a vast arena of jobs that people do in the world, and frequently no one really knows what another person does when they go to work. Most everyone has a title associated with their job, but these titles generally do little to describe what a person actually does.

I don’t know what my family or friends do at work, but every day they get up in the morning, go to work, and come home in the evening. When I ask the question “What do you do all day at work?” the answer is frequently “lots of things.”

As an architect, my answer to that same question could also be “lots of things”.

Architecture is a design profession, but the notion of design goes far beyond lines on paper (or computer monitor). There is a great deal of variation within the field architecture, as there is in most professions. Below is a look into what I do as a sole practitioner architect, working in the San Francisco Bay Area. I have omitted the ‘behind the scenes’ work, such as the work of landing a job, developing a program, discussing and evaluating a budget, and many other associated processes that occur before a project is actively begun.

Due diligence plays an integral role in an architect’s job, although certainly this is not the sexy part of the work. Due diligence includes: local code research; site-specific research; understanding possible site restrictions; and procuring any documents required by the governing agency such as a survey, soils report, etc. Feasibility studies, programming, and budget analysis can also be part of this process. Requirements such as design review, presenting to committees, height and set-back limitations, and discussions and meetings with the governing jurisdiction are also a part of due diligence.

Once the due diligence is underway (and this can be an on-going process), the design can begin. Design is typically broken into three parts: site design, schematic design, and design development. But design is not a linear process with a beginning, middle, and end. It is more of a serpentine movement, one that has a beginning and an end, but with many wiggles in between.

It is nearly impossible to describe a design process, as it is truly a process that begins with a line on a piece of paper that is transformed, based on the site, geography, position of the sun, clients’ needs and desires, program, and what is seen, heard, thought, read, dreamed, smelled, and even eaten. The end product is both an abstract and a dialogue that covers all elements of life, and it is dedicated to the client and to good design.
 There are sub-sets of design that are more tangible and easier to describe than the pure design process. Site design is an important first step in the design process, where geography, climate, solar evaluation, wind and weather patterns, access, views, light quality, etc., are all important factors to consider and understand before beginning the design of a building. Other sub-sets of design which are part of an architect’s work include lighting design (when a lighting consultant is not used), kitchen and bath design, cabinet and furniture design, color, texture, and material palettes, furniture lay-out, office lay-out, stair design, steel design, glass design, even textile design.



As the design and details are being developed, the architect's language is expressed graphically in the conventions of plan, section, and elevation. Plans are views looking directly down at a horizontal surface (a bird's eye view), and include floor plans, roof plan, (showing all roof planes, roof slopes, skylights, and any other roof elements), and electric plan (all light fixtures, receptacles, and light switching).

The floor plan shows location of all walls, windows, doors, stairs, kitchen and bath lay-out, casework, decks and patios, trellises, landscaping features, etc. Dimensions of all exterior and interior walls and components are notated, as well as special instructions. Every window and door is located within a wall and given a number, which is cross-referenced on the window/door schedule (schedules discussed below). Architectural symbols are marked on the plan denoting where sections, details, interior elevations, and blown-up plans (frequently kitchens, baths, and special conditions) have been drawn. The plan becomes very dense with information, and it is a bit of a design exercise to make this sheet easy to read and also look graphically beautiful.
PLUShouse floor plan
Sections are vertical cuts taken through a building, like cutting a loaf of bread into slices. Several sections are frequently taken through a building in order to describe different roof planes, floor elevation changes, wall conditions, etc. Vertical control is identified on the sections, ceiling and roof heights are dimensioned, stairs and railings are layed out and dimensioned, and any other elements best described in sectional view are noted.


PLUShouse sections

Elevations are views looking straight at a vertical plane, and are drawn for every exterior wall and frequently for every interior wall. Elevations show windows, doors, roofs, rain water downspouts, and any other elements located on a wall.
PLUShouse north & east elevations
Architectural details are an important part of design, and are in no way subordinate to the overall building design. Details are specific to each building, and respond to the idea and design of the building in the way materials, elements, components, and building parts are joined. If a steel post is exposed, do you see the connection of the post to the beam it is supporting, or is this a blind connection? If you can see the soffit (underside of the roof) when you look out a window, what is the material, color, shape, texture of the soffit, and how does it relate to the building as a whole? Details can be drawn in one or in multiple conventions of plan, section, and elevation. The detailing of the building should be consistent with the overall building idea, and must occur both in a functional and aesthetic manner.
Fisher/Castellano stair details
In order to detail a building well, it is necessary to have a thorough knowledge of structure, technique, products, fasteners, weather-proofing, materials, and methods of construction. Said differently, one has to know how a building is built, understand the materials used in the building (their opportunities and limitations), how to keep the water out, and also keep the building beautiful. Detailing is fun and multi-faceted, and it frequently informs the overall building design as well as the structural design.

Mies van der Rohe


 As Mies van der Rohe (a German architect 

at the forefront of modernist design in the 
early 20th century) stated, “God is in the details.”




An empirical task architects perform is the development of product and material schedules. This is typically done in spread-sheet format. All products associated with the project - windows, doors, electric and plumbing products, hardware, appliances, etc. need to be listed and described by type, manufacturer, product identification number, size and color, as well as any special notations (e.g. window gets installed directly to corner post, no return). A finish schedule lays out similar information, and describes all materials and surface treatments used in the building, both interior and exterior. The finish schedule includes wall finishes, paint colors, flooring, kitchen countertop, casework, roofing, soffit, railings, decks and patio material etc. For instance, an interior stair rail will be specified as 3"x1/2" cold steel bar, clear finish, eased edges, blind weld spots. The schedules are ultimately used by the builder in pricing the building, ordering the materials and products, and getting the project built with the intended products and finishes.
Door schedule
Coordinating the architecture drawings with the engineering drawings (structural, civil, mechanical, and electrical), and with recycled water and photovoltaic systems drawings, is also part of an architects’ job. Even though a building may look very simple, it can have a complex structure that needs to be precisely coordinated with the architecture. For this reason, a thorough understanding of how all systems work, and how they are integrated with and become a part of the building, is of great importance. This is one of the tasks I look forward to - I get to use my latent technical skills, and it signifies that the design will soon become a reality of a built building.
Structural/Architecture coordination
The final output, before construction can begin, is a to create a set of construction documents. These documents consist of detailed graphic and written instructions that set forth the requirements for the construction of the project. Included are the architecture drawings, details, specifications, and schedules of materials and products, as well as all building systems (structural, mechanical, electric), site utilities, and other components applicable to the project ( e.g. recycled water systems and solar systems). This set of documents becomes the basis upon which the building is built. It is also the document submitted to the governing city when applying for a building permit, the last step before construction can begin.

An architect’s work does not end once the design and construction documents are finalized, and the construction has commenced. Architects are frequently involved in the selection of the General Contractor (this frequently occurs at the project outset), the bidding and price negotiation process, and with budget analysis and review. Other ‘behind the scenes’ tasks include client meetings, presentations, model building, 3-dimensional drawings and sketches, sun angle calculations (to determine the depth of roof overhangs or sun shades), product research, permit submittals, keeping up with sustainable issues and products, building and coordinating a strong project team, and so on.

Once construction has begun, the architect oversees the construction process with site visits, discussions with the general contractor and subcontractors, review of payments, change orders, product substitution, and any modifications or changes that may occur during the building process. It is extremely rewarding to develop a relationship and work closely with a client, to see a project team work towards a common goal, and to experience the transformation of an idea to a design, to a set of drawings, and then to a beautiful and functioning building.


 

Fisher/Castellano Residence
Architects are both artists and mechanics. The end product, the Architecture, must be beautiful. It must make you feel a certain way, slow you down, and create an experience both in the approach to, and movement through, the building. A building must also keep out the weather, comply with planning and building codes, respond to a program, meet a certain budget, get built in a timely manner, and be environmentally sustainable. All these items are important in designing and producing a good building.

It’s a lot of things, and it’s all about taking it from here to there.


Lindy Small Architecture AIA
www.LindySmallArchitecture.com
http://plushouse.blogspot.com
Lindy@LindySmallArchitecture.com







Wednesday, July 31, 2013

NUTS & BOLTS





There are so many things we take for granted, accepting that these things will perform as we expect and anticipate them to do. The telephone for instance. An airplane taking flight, a computer giving us information, a simple water meter. There are people who understand how these things work, but to many of us, the operations of these things are more miraculous than understood. I have solidly been in the camp of people who have never taken the time to learn what actually makes a thing work. Until now.

The PLUShouse design is at the end of the development phase, and we have submitted the project to Oakland for planning approval. Included in the submittal to Oakland is the design of the house and the landscape, as well as the design of the recycled grey water system and the rain water collection system. These water systems were designed by our water consultant, Design Ecology, based in San Francisco, California. These guys have been extremely helpful and patient in walking me through the design of the systems. All diagrams shown are from Design Ecology and are intended for the PLUShouse.

PLUShouse water systems design by Design Ecology

In very broad strokes, I will explain how these systems work.

There will be 3 distinct water systems in the PLUShouse:
1.        Municipal water system, for potable water and water used in sinks and showers.
2.        Grey water system, which recycles all water except food sink and toilet water, which will be used in irrigation and toilets.
3.        Rain water collection system, which collects rain water from the roof to be used for irrigation and toilets.

These three water systems are plumbed independently, but will have the ability to feed into each others' systems to satisfy the particular demands for water.

Municipal water system
 We take indoor plumbing and municipal-supplied water for granted, but indoor plumbing was extremely rare until the growth of modern cities in the early 19th century, when better waste disposal systems were installed to prevent disease. In 1845 the first screw-down water tap was patented, and indoor plumbing began to be installed in buildings in the mid-late 19th century.

women carrying water in Nigeria
City-supplied water originated in ancient civilizations to provide public baths, potable water, and drainage of wastes. Standardized earthen plumbing pipes appeared in the Indus Valley civilization by 2700 B.C. The Roman Empire had a vast system of aquaducts to transport water from far away, and used lead pipes to bring the water into homes, public wells, and fountains.


Roman Aquaduct
Roman fountain @ Villa D'Este
We now have more advanced technology and know not to use lead pipes to transport water. But our water can still come from great distances. Oakland water originates from several sources, much of it coming from the Mokelumne River in central Sierra Nevada. This water is stored in the Camanche and Pardee Reservoirs, then transported to Oakland via the Mokelumne Aquaduct. The water is then routed to each neighborhood and directed into each building, where it is piped to each specific plumbing fixture. 

After municipal water is used it is collected in sewer laterals that feed into a network of city sewers, where interceptors (large pipes) carry the water to a treatment plant in Oakland. Here it goes through primary treatment involving screening and settling out large particles. The water then moves to secondary treatment where organic matter is removed and the water is disinfected to remove any remaining bacteria. After being treated, the water is discharged into the San Francisco Bay.

Grey water system 
If a greywater system is installed in a building, all used water is separated into either grey water or brown water.  Greywater comprises 50% - 80% of residential "waste" water, and is essentially all water that has been used, excluding water from toilets and food sinks. A greywater system, such as the one we will be installing in the PLUShouse, recycles greywater for irrigation and toilet water.

The ‘elevator version’ of how a domestic greywater system works is as follows:
After water has gone down the drain (from all fixtures except food sinks and toilets), it is routed to a separate greywater plumbing system. The water passes through a pre-filter, and then enters a greywater holding tank. This tank can either be above or below ground, and is sized according to projected water usage. The greywater tank in the PLUShouse will be a 200 gallon tank (roughly 3x the size of a standard domestic hot water heater), and will be buried underground. When there is a demand for water by either the irrigation system or to fill a toilet tank, the stored greywater will be pumped through a series of filters, then enter the system requiring water. If there is not enough water in the greywater tank to satisfy the demand, water will come first from the rain water tank, then from municipal-supplied water if the rain water tank is empty. According to code, water can remain in the greywater tank for 24 hrs. If the water is not used within this time frame it is drained to the city sanitary sewer line. The brown water, which is not recycled, is directed to the municipal sewer system.


greywater treatment

Stormwater runoff is considered sewage, and goes to a separate facility. Certain cities, including San Francisco, have a combined system for sanitary sewer and sewage.

Rain water collection system
The third plumbing system to be installed in the PLUShouse is the roof water catchment system, or rain water harvesting system. Similar to municipal water and greywater systems, it has a very long history, beginning in the 3rd century BC with the farming communities in present day Pakistan, Afganistan, Iran, and India. Currently, it is common practice to use rain water for all water needs in many parts of the world. In California it is only legal to use rain water for irrigation and for toilets, although in Alaska, Texas, and Ohio rain water can be used in all applications, including potable water. It is mandated to install water harvesting systems in new residences in Santa Fe, New Mexico, and in the US Virgin Islands, as well as in many parts of Australia and other parts of the world with low precipitation.

Cudo system
The rain harvesting system we will be installing in the PLUShouse works in a similar manner to the greywater system, but the holding tank is much larger and there is no time limit for water to be held in the tank. The size of the tank is determined by the average annual rainfall in each specific location. Oakland has an average rainfall of 23.3” per year, which translates into a 13,000 gal. holding tank (100'x16'x6').  Instead of using a pre-fabricated water tank, we will be using a Cudo modular storage system, which is basically a series of 2’x2’x2’ plastic milk-type crates, secured together, wrapped in geotextile, surrounded by sand, and then wrapped in a polypropylene plastic liner. The crates act only to keep the shape of the ‘ tank’, which is really just a large bladder buried 2’ underground.

The short version of how rain water harvesting will work in the PLUShouse:
Rain water from the metal roof will drain to downspouts; run into underground pipes to the rain water tank location; pass through a pre-filter; then enter the rain water storage tank. (Water from the first rainfall of the season gets shed into the sanitary sewer system, as it has too much debris from the roof). A ‘smart valve’ tells the tank when water is needed, and the stored rain water is then pumped, or gravity-fed, from the tank, through a series of filters (backwashing carbon unit, reverse osmosis system or sand filter, UV filtration), and then to the desired location (toilet or irrigation). A valve determines if additional municipal water is needed to meet the demand, which is then supplied if necessary. As we are planting extreme drought-resistant landscaping, and anticipate using a total of 50 gal. of water per day, the greywater and rain harvesting systems should supply 100% of all non-potable water to the PLUShouse. What a wonderful way to go!


underground rain water tank


rain water filtration

Water is something we tend to take for granted, expecting it to miraculously come out of a faucet when we turn a knob, and continue to flow until we close the knob. This is not the case in many parts of the world, where water must be physically transported from miles away, and so is used with great care and thought. It seems wasteful to use water for a single application, when we can easily recycle this water for other uses. Design Ecology (our design consultant) will be canvassing Oakland to approve the usage of rainwater not just for irrigation and filling toilet tanks, but to use rain water as potable water and in all sinks, showers, and appliances. I will keep you posted on our progress.



next blog topic: how photovoltaic cells (solar panels) work
 

Lindy Small